1
Baseline
Most 100A → 200A Stockton upgrades start around $2,400. That covers the new panel, service riser, meter socket, main disconnect, permit, and PG&E disconnect/reconnect on the same day.
2
Older + hazard panels cost more
Panels 40+ years old often need service-entrance replacement. FPE, Zinsco, and Pushmatic panels take extra care to remove — most electricians add $300-600 for these.
3
Adding EV / solar / hot tub
Bundling a new dedicated circuit into the upgrade permit saves money vs. doing them separately later. EV chargers add ~$800, hot tub subpanel ~$600, solar interconnect ~$300.
4
Why our estimates aren't lowball
National averages ($1,500-$2,500) don't include Stockton-area permit fees, PG&E service charges, or 2026 material costs. Our ranges reflect what local licensed electricians actually charge.